Holiday Unit 4 – Renovation
For this holiday unit renovation in Mooloolaba, we began by transforming the ensuite and bathroom. The existing spa bath was removed, making way for an enclosed semi-frameless shower recess. We completed a full strip-out, including tile bedding, and applied a new waterproofing membrane for durability. The bathroom was further upgraded with a tiled shower niche, new plumbing and electrical systems, and energy-efficient LED downlights. A wall-hung vanity with a stone benchtop, a new toilet suite, and Highgrove Bathrooms fixtures and fittings were installed, all complemented by rectified edge porcelain tiles and freshly painted ceilings.
In the kitchen, we focused on maximising space and functionality, particularly for holiday unit guests. We provided new kitchen CAD drawings for client approval and installed premium stone benchtops, a sleek glass splashback, and soft-close doors and drawers. The kitchen was completed with new appliances.
The laundry was also upgraded with new tiles, a stainless steel wash tub, and sliding doors. Additionally, we modernised the wardrobes by removing the old doors and shelving, installing open shelving with hanging rails, and fitting new sliding doors. Throughout the unit, we removed the existing popcorn ceilings, applied a smooth white set plaster finish, and installed new LED oyster lights. The renovation was finished with a full internal repaint and new hybrid timber flooring, giving the space a fresh and modern feel.
Ensuite & Bathroom Reno
- Removed existing shower recess’s
- Converted space into an enclosed semi-frameless shower recess
- Complete strip out including tile bedding
- New waterproofing membrane
- New tiled shower niche
- New plumbing & electrical
- New LED downlights
- New wall hung vanity with stone benchtop
- New Toilet suite
- Rectified edge porcelain tiles
- Highgrove bathrooms fixtures and fittings
- Paint ceilings
New Wardrobes
- Remove and dispose of wardrobe sliding doors and internal shelving
- Install new open shelving with hanging rail shelf
- Install new sliding wardrobe doors
Flooring
- New hybrid timber flooring throughout
Laundry
- New tiled Laundry recess with sliding doors and stainless wash tub
New Kitchen
- Designed new kitchen to maximise space and functionality
- Provision of new kitchen CAD drawings for client review & approval
- New premium stone-bench-tops
- Glass splashback
- Soft-close doors & drawers
- New appliances
Ceilings
- New Ceilings with LED downlights
- Remove existing popcorn ceilings
- Apply white set plaster finish
- Install new LED oyster lights throughout
- Full internal re-paint
Year:
2024Location:
Mooloolaba, QLDBuilding Type:
Holiday UnitService Type:
Full Renovation