Holiday Unit 2 – Renovation
This renovation project involved a complete bathroom transformation, starting with the removal of the old shower recess, toilet cubicle, and vanity, followed by a full strip-out. We installed a new waterproofing membrane, upgraded plumbing and electrical systems, and added energy-efficient LED downlights. The bathroom now features a tiled shower niche, a wall-hung vanity with a stone benchtop, and Highgrove Bathrooms fixtures, all finished with rectified edge porcelain tiles.
In the kitchen, we optimised the space for holiday unit guests by designing a new layout with stone benchtops, soft-close cabinetry, and modern appliances. The renovation also included the installation of new ceilings with LED downlights throughout the property, along with a full internal repaint to give the space a fresh, updated look.
Bathroom Reno
- Removed existing bathroom shower recess, toilet cubicle, vanity
- Complete strip out including tile bedding
- New waterproofing membrane
- New tiled shower niche
- New plumbing & electrical
- New LED downlights
- New wall hung vanity, laundry overhead cabinet with stone benchtop
- New Toilet suite (close coupled skew trap)
- Rectified edge porcelain tiles
- Highgrove bathrooms fixtures and fittings
New Kitchen
- Design new kitchen to maximise space and functionality
- Provision of new kitchen CAD drawings for client review & approval
- New stone-bench-tops
- Soft-close doors & drawers
- New appliances
New Ceilings with LED downlights
- Install new ceiling battens and plasterboard
- Install new LED downlights throughout
- Full internal re-paint
Year:
2022Location:
Maroochydore, QLDBuilding Type:
Holiday UnitService Type:
Full Renovation